Contact us:
01534 744281

Commercial

Below you will find our completed commercial projects. Office fit-outs are our speciality and we work hard to provide innovative interiors solutions in this sector.

HAWKSFORD

Following the Covid 19 pandemic it became apparent that working in an office environment had to change, one of the first to take on the challenge of redefining the office environment was Hawksford who chose Style Interiors to carry out the works.

Consisting of reducing office space and a phased programme of works the project involved stripping the office areas back to shell and encompassing new air conditioning works on behalf of the landlord within the same project, the works covered 3 floors and new works included full mechanical and electrical, new ceilings, plasterboard and acoustic glass partitions, acoustic celing rafts and baffles, floor finishes, WC refurbishment, tea point and kitchen installations, feature joinery and decorations.

  • ARCHITECT: AXIS MASON
  • PROGRAMME: 18 WEEKS

SANTANDER WORK CAFE

Complete refurbishment of the former Thomas Cook shop to create a Work Café and offices for Santander. This project included full mechanical and electrical installation, new flooring, the formation of plasterboard walls and plaster finishes and the manufacture and installation of bespoke joinery and kitchens. Works also included glazed partitions, feature ceiling rafts, full decoration and the installation of new entrance doors. All works were carried out under the constraints of the Covid 19 pandemic in 2020, making the project particularly challenging.

  • ARCHITECT: SANTANDER DESIGN SERVICES
  • PROGRAMME: 18 WEEKS

CHANNEL 103

The project for Channel 103 involved moving the live radio station to their new home in Britannia Place, the existing building was stripped back to shell and then fitted out to the client’s requirements. The works carried out included forming two sound proof broadcasting studios complete with sound absorbing wall coverings and triple glazed windows, data room and general finishes of new ceilings, decorations and flooring together with the installation of technical broadcasting cabling, new lighting and ventilation.

  • ARCHITECT: AXIS MASON
  • PROGRAMME: 8 WEEKS

VISTRA

This project comprised the strip out and refurbishment of two floors of office space including the ground floor reception area and 4th floor offices. Works included new flooring, partitions, ceiling, M&E alterations, joinery and decorations.

  • ARCHITECT: AXIS MASON
  • PROGRAMME: 8 WEEKS

AMERICAN EXPRESS

The team worked closely with the design team and client on this Cat B fit out focusing on the functionality of the offices and collaborative connectivity to the network of AMEX offices. The works included acoustic double glazed internal frameless partitions, construction of MF plasterboard ceilings, bespoke joinery to create a high quality kitchen, breakfast bar and storage, extensive electrical works and creative wall solutions in a variety of materials for collaborative working.

  • ARCHITECT: AXIS MASON
  • PROGRAMME: 22 WEEKS

JERSEY POST

The project for Jersey Post included the demolition of the existing external stores and the construction of a new steel frame and composite clad extension to the existing docking station and parcel storage area, including piled foundations and a power floated slab. Also included were internal and external M&E works and new drainage and external works including tarmac to suit the new site layout. Works carried out in three phases to keep the property fully operational throughout.

  • ARCHITECT: WADDINGTON ARCHITECTS
  • PROGRAMME: 20 WEEKS

Get In Touch

We are based at Style House in St Peter where we can:

  • Provide help and advice for your project no matter what elements of our service you need
  • Offer our hands-on approach to delivering projects on time, on budget and with minimum disruption
  • Work directly with end users or in conjunction with construction professionals